Home / Royal Mail / Castle temporarily closed for safety checks following reports of fallen stone work

Castle temporarily closed for safety checks following reports of fallen stone work

Narberth Castle is closed to visitors (Image: Pembrokeshire County Council)

Narberth Castle has been temporarily closed for safety checks, the council has confirmed.

Reports of fallen stone work earlier this week, promoted a temporary closure for inspection and necessary repairs to be established by the local authority.

Head of Planning Nicola Gandy has confirmed it will be reopened to the public as soon as practically possible and once the site has been deemed safe.

“Narberth Castle is closed while safety checks are carried out,” confirmed a council spokesperson on Friday, 9 June.

“A dangerous structure report was filed with building control earlier this week after fallen stone work was found on the ground and inspection carried out.

“To protect the safety of pedestrians and members of the public the area has been closed temporarily.

“The level of repairs required will be established by the Local Authority conservation officer and structural engineer, before the castle is made safe and re-opened as soon as practically possible.

“Officers will consult with Cadw before any repairs commence.”

Head of Planning Nicola Gandy said: “Officers are assessing the areas of fallen stone at Narberth Castle and the site will remain closed for safety while this is carried out.

“Once the Castle is made safe it will be reopened to the public.”


Source link

About admin

Check Also

Parcels of land: is the Czech Sphinx gazing at Royal Mail’s property assets? | Royal Mail

The shadow of the Sphinx looms large over a nondescript urban depot in north London. …

Leave a Reply

Your email address will not be published. Required fields are marked *